Baseline Definition and Benchmark Scope
HDPE backroom crate molds in Southeast Asia are defined by wall thickness 2β5 mm, cavity count 4β16, and shot weight 800β3,500 g. Baseline scope covers tooling for rigid, stackable logistics containers requiring impact durability at ambient and chilled temperaturesβwhere HDPE's superior low-temperature toughness versus PP is essential. Mold materials: P20/1.2311 or NAK80 for high-volume runs (>500k shots). Gate design: submarine or hot-runner systems to minimize shrinkage variance within the 2.0β3.0% HDPE range. Cooling: standard water circuits for cycle times 45β90 seconds. Regional baseline assumes ISO 50008 quality, CMM verification, and post-mold stress relief for dimensional stability in stacked logistics applications.