Baseline Definition and Benchmark Scope
This benchmark covers single-cavity and multi-cavity PP nestable-basket molds manufactured in Southeast Asia (Thailand, Vietnam, Indonesia) for agricultural storage applications. Scope includes molds producing baskets with 1.5–3 mm wall thickness, PP density 0.90 g/cm³, and UV-stabilized formulations. Baseline assumes mold base 300–600 mm length, 200–400 mm width, cavity count 2–8. Quality acceptance: dimensional tolerance ±0.05 mm on critical nesting surfaces, surface finish Ra 0.8–1.6 µm. Lead-time measurement begins at PO and ends at FOB port. Cycle-time baseline: 18–28 seconds per shot at mold temperature 40–60°C, accounting for PP's 1.5–2.0% shrinkage compensation and cooling requirements for wall uniformity.