Baseline Definition and Benchmark Scope
HDPE agriculture basket molds in Africa are defined by 2β5 mm wall thickness, 180β230Β°C processing temperature, and 2.0β3.0% shrinkage tolerance. Benchmark scope covers tooling cost (USD 4,500β8,200 for single-cavity progressive molds), material cost per part (USD 0.18β0.35 at 0.94β0.97 g/cmΒ³ density), and cycle times of 35β55 seconds. Regional lead-time baseline is 10β14 weeks from order to first articles. Quality KPIs include dimensional tolerance Β±0.3 mm, surface finish Ra 1.6β3.2 Β΅m, and impact strength β₯8 kJ/mΒ² (HDPE's low-temperature advantage). Scope excludes secondary operations and assembly labor.